Suncor Fort Hills – Infrastructure Block

Inline Group worked for Bird Construction during the development of the Infrastructure Block on the Suncor Fort Hills project. The project lasted over 18 months with a peak manpower of 12 people daily. Inline successfully completed the project with zero safety or quality incidents.

SERVICES EXECUTED

  • Pile Layout and Asbuilt
  • Concrete, Anchor Bolt Layout and Asbuilt
  • Excavation Layout, and Asbuilt for Volume Tracking
  • Underground Utility Layout and Asbuilt
  • Control Establishment and Monitoring
  • Provided Comprehensive Turnover Package

Project Details

Working with Bird Construction on the Infrastructure Project Block was Inline’s first big substantial project with a major contractor. During this project Inline refined our document control processes and daily deliverables to meet the demands of a client such as Bird and Suncor Energy. This project will always be remembered as an important project for Inline.

Safety is our culture

2791
Days without a LTI
576721
Safe Work Hours

Let's work together

Inline is excited to provide you with a quote for your next project